Fields / 6306/9-U-1
6306/9-U-1
Other, shallow gasPlugged
Drilled by Lundin Energy Norway AS with Deepsea Stavanger, 04.01.2022 to 05.01.2022 (1 days), to 595,0 m.
Water depth228,0 m
Total depth595,0 m MD
Vertical depth595,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Stavanger
Spud04.01.2022
Completed05.01.2022
OperatorLundin Energy Norway AS
Position63,3763 N, 6,7585 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Casing and formation tests
No casing programme is reported for this wellbore.