Fields / Kristin / 6406/2-L-2 AY1H
6406/2-L-2 AY1H
Development, productionProducingGas
Drilled by Equinor Energy AS with Transocean Spitsbergen in Kristin, 20.08.2024 to 08.09.2024 (19 days), to 7 413,0 m.
Water depth270,0 m
Total depth7 413,0 m MD
Vertical depth4 674,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigTransocean Spitsbergen
Spud20.08.2024
Completed08.09.2024
OperatorEquinor Energy AS
Position64,8451 N, 6,5530 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Kristin gradient | 35,6 °C/km |
| Estimated at total depth from the gradient | 159 °C |
The gradient is the median of 14 released wells in Kristin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6406/2-L-2 AY2H same well | 0,0 | 6 700,0 | - | - | 2024 |
| 6406/2-L-2 H same well | 0,0 | 6 105,0 | - | - | 2024 |
| 6406/2-L-1 Y1H | 0,0 | 7 196,0 | - | - | 2024 |
| 6406/2-L-1 Y2H | 0,0 | - | - | - | - |
| 6406/2-L-3 Y1H | 0,0 | - | - | - | 2025 |
| 6406/2-L-3 Y2H | 0,0 | - | - | - | - |
| 6406/2-L-4 Y1H | 0,0 | - | - | - | 2025 |
| 6406/2-L-4 Y2H | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.