Fields / Kristin / 6406/2-R-4 CH
6406/2-R-4 CH
Development, productionClosedGas and condensate
Drilled by Statoil Petroleum AS with Scarabeo 5 in Kristin, 28.03.2015 to 25.08.2015 (150 days), to 5 968,0 m.
Water depth355,0 m
Total depth5 968,0 m MD
Vertical depth4 871,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud28.03.2015
Completed25.08.2015
OperatorStatoil Petroleum AS
Position64,9602 N, 6,4386 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Kristin gradient | 35,6 °C/km |
| Estimated at total depth from the gradient | 164 °C |
The gradient is the median of 14 released wells in Kristin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6406/2-R-4 AH same well | 0,0 | 5 290,0 | - | - | 2005 |
| 6406/2-R-4 BH same well | 0,0 | 5 505,0 | - | - | 2005 |
| 6406/2-R-4 H same well | 0,0 | 5 262,0 | - | - | 2004 |
| 6406/2-R-1 H | 0,0 | 6 352,0 | - | - | 2004 |
| 6406/2-R-3 H | 0,0 | 5 996,0 | - | - | 2004 |
| 6406/2-R-2 H | 0,0 | 5 954,0 | - | - | 2004 |
| 6406/2-S-1 H | 1,9 | 5 746,0 | - | - | 2004 |
| 6406/2-S-2 H | 1,9 | 5 362,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.