Fields / 6406/3-1
6406/3-1
Exploration, wildcatPlugged and abandonedGas shows
Drilled by Den norske stats oljeselskap a.s with Ross Isle, 27.04.1984 to 14.08.1984 (109 days), to 4 902,0 m in the Red Beds (informal).
Water depth256,0 m
Total depth4 902,0 m MD
Vertical depth4 896,0 m TVD
Bottom-hole temperature169 °C
Max inclination9,5°
Rotary table22,0 m
Formation at total depthRed Beds (informal)
RigRoss Isle
Spud27.04.1984
Completed14.08.1984
OperatorDen norske stats oljeselskap a.s
Position64,7583 N, 6,8227 E
Formations
23 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 169 °C |
| Drill-stem test at 3 787,5 m | 140 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6406/3-7 | 5,6 | 4 520,0 | 162 °C | 1,86 | 2006 |
| 6406/6-1 | 6,4 | 4 715,0 | - | 1,81 | 1985 |
| 6406/3-6 | 7,9 | 4 175,0 | 151 °C | 1,75 | 2002 |
| 6406/3-D-2 H | 8,3 | 4 310,0 | - | - | 2010 |
| 6406/3-D-3 AY1H | 8,3 | 6 958,0 | - | - | 2012 |
| 6406/3-D-3 AY2H | 8,3 | 7 203,0 | - | - | 2012 |
| 6406/3-D-3 H | 8,3 | 4 482,0 | - | - | 2012 |
| 6406/3-D-1 AY1H | 8,3 | 5 803,0 | - | - | 2011 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 352,0 | 36" | 354,0 | - |
| Surface casing | 20" | 945,0 | 26" | 962,0 | 1,71 LOT |
| Intermediate | 13 3/8" | 2 148,0 | 17 1/2" | 2 177,0 | 1,85 LOT |
| Intermediate | 9 5/8" | 3 765,0 | 12 1/4" | 3 784,0 | 2,07 LOT |
| Liner | 7" | 4 470,0 | 8 1/2" | 4 505,0 | 2,16 LOT |
| Open hole | - | 4 902,0 | 6" | 4 902,0 | - |
Mud weight
66 measurements, one dot each, 1,00 to 1,89 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 3 782,5 - 3 787,5 | 15,9 | 67,0 | 140 | - | 8 000 |