6406/9-1

Exploration, wildcatPlugged and abandonedGas

Drilled by A/S Norske Shell with Transocean Leader, 15.06.2004 to 02.06.2005 (352 days), to 5 080,0 m in the Åre Formation.

Water depth308,0 m
Total depth5 080,0 m MD
Vertical depth5 077,0 m TVD
Bottom-hole temperature184 °C
Max inclination7,0°
Rotary table23,5 m
Formation at total depthÅre Formation
RigTransocean Leader
Spud15.06.2004
Completed02.06.2005
OperatorA/S Norske Shell
Position64,4463 N, 6,8153 E

Formations

29 tops reported, measured depth in metres.

GroupsNordland Group, top 332,5 mNordland GpHordaland Group, top 1 655,0 mHordaland GpRogaland Group, top 2 247,0 mRogaland GpShetland Group, top 2 405,0 mShetland GpCromer Knoll Group, top 2 928,2 mCromer Knoll GpViking Group, top 4 253,6 mViking GpFangst Group, top 4 414,5 mFangst GpBåt Group, top 4 633,5 mBåt GpFormationsNaust Formation, top 332,5 mNaust FmKai Formation, top 1 191,0 mKai FmBrygge Formation, top 1 655,0 mBrygge FmTare Formation, top 2 247,0 mTang Formation, top 2 333,0 mSpringar Formation, top 2 405,0 mNise Formation, top 2 515,5 mNise FmKvitnos Formation, top 2 731,5 mKvitnos FmLysing Formation, top 2 928,2 mLysing FmLange Formation, top 3 405,2 mLange FmLyr Formation, top 4 229,0 mSpekk Formation, top 4 253,6 mMelke Formation, top 4 268,5 mGarn Formation, top 4 414,5 mNot Formation, top 4 471,5 mIle Formation, top 4 532,5 mRor Formation, top 4 633,5 mTofte Formation, top 4 680,5 mRor Formation, top 4 720,5 mTilje Formation, top 4 826,0 mTilje FmÅre Formation, top 5 024,0 m3321 0002 0003 0004 0005 0005 080

Temperature

Reported at total depth184 °C
Drill-stem test at 5 004,0 m43 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6406/9-1 A same well0,0----
6406/9-23,45 348,0184 °C1,852007
6406/9-38,35 138,0186 °C1,942013
6406/6-28,54 670,0172 °C1,852006

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"417,036"417,0-
Surface casing20"1 375,026"1 375,01,74 LOT
Intermediate16"2 243,017 1/2"2 244,01,89 LOT
Intermediate13 3/8"2 873,014 7/8"2 873,01,95 LOT
Intermediate9 5/8"4 365,012 1/4"4 365,02,13 LOT
Liner7"5 080,08 1/2"5 080,0-

Mud weight

17 measurements, one dot each, 1,00 to 1,90 g/cm³ against measured depth, glydril mud, glydrill wbm, paratherm, pharaterm, spud mud.

1,01,21,41,61,801 0002 0003 0004 0005 000405,0 m: 1,05 g/cm³, SPUD MUD644,0 m: 1,05 g/cm³, SPUD MUD1 381,0 m: 1,55 g/cm³, GLYDRIL MUD1 820,0 m: 1,82 g/cm³, GLYDRILL WBM2 248,0 m: 1,70 g/cm³, GLYDRIL MUD2 793,0 m: 1,75 g/cm³, GLYDRIL MUD3 251,0 m: 1,77 g/cm³, PHARATERM3 544,0 m: 1,79 g/cm³, PHARATERM4 075,0 m: 1,87 g/cm³, PARATHERM4 306,0 m: 1,87 g/cm³, PARATHERM4 546,0 m: 1,89 g/cm³, PARATHERM4 591,0 m: 1,88 g/cm³, PARATHERM4 710,0 m: 1,90 g/cm³, PARATHERM4 718,0 m: 1,89 g/cm³, PARATHERM4 880,0 m: 1,88 g/cm³, PARATHERM5 063,0 m: 1,89 g/cm³, PARATHERM5 080,0 m: 1,88 g/cm³, PARATHERM

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
24 619,0 - 4 634,019,028,049-1 440 000
14 964,0 - 5 004,022,023,043-1 410 000