Fields / Tyrihans / 6407/1-A-3 BH
6407/1-A-3 BH
Development, observationPluggedOil and gas
Drilled by Equinor Energy AS with Transocean Norge in Tyrihans, 06.03.2021 to 20.04.2021 (45 days), to 5 332,0 m.
Water depth288,0 m
Total depth5 332,0 m MD
Vertical depth4 024,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,9 m
Formation at total depth-
RigTransocean Norge
Spud06.03.2021
Completed20.04.2021
OperatorEquinor Energy AS
Position64,8890 N, 7,0714 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tyrihans gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 142 °C |
The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/1-A-3 AY1H same well | 0,0 | 6 979,0 | - | - | 2014 |
| 6407/1-A-3 AY2H same well | 0,0 | 7 309,0 | - | - | 2014 |
| 6407/1-A-3 AY3H same well | 0,0 | 7 600,0 | - | - | 2014 |
| 6407/1-A-3 CH same well | 0,0 | 6 546,0 | - | - | 2021 |
| 6407/1-A-3 H same well | 0,0 | 4 823,0 | - | - | 2014 |
| 6407/1-A-2 AY1H | 0,0 | 7 456,0 | - | - | 2013 |
| 6407/1-A-2 AY2H | 0,0 | 7 441,0 | - | - | 2013 |
| 6407/1-A-2 AY3H | 0,0 | 7 612,0 | - | - | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.