Fields / Tyrihans / 6407/1-A-4 AY2H
6407/1-A-4 AY2H
Development, productionProducingGas and condensate
Drilled by StatoilHydro Petroleum AS with Transocean Arctic in Tyrihans, 07.02.2009 to 24.02.2009 (17 days), to 6 500,0 m.
Water depth288,1 m
Total depth6 500,0 m MD
Vertical depth3 686,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigTransocean Arctic
Spud07.02.2009
Completed24.02.2009
OperatorStatoilHydro Petroleum AS
Position64,8889 N, 7,0714 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tyrihans gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 129 °C |
The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/1-A-4 AY1H same well | 0,0 | 6 350,0 | - | - | 2009 |
| 6407/1-A-4 H same well | 0,0 | 4 563,0 | - | - | 2008 |
| 6407/1-A-1 AY1H | 0,0 | 7 384,0 | - | - | 2010 |
| 6407/1-A-1 AY2H | 0,0 | 7 300,0 | - | - | 2010 |
| 6407/1-A-1 AY3H | 0,0 | - | - | - | - |
| 6407/1-A-1 H | 0,0 | 4 744,0 | - | - | 2010 |
| 6407/1-A-3 AY1H | 0,0 | 6 979,0 | - | - | 2014 |
| 6407/1-A-3 AY2H | 0,0 | 7 309,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.