Fields / Tyrihans / 6407/1-C-1 H
6407/1-C-1 H
Development, productionClosedOil and gas
Drilled by Equinor Energy AS with Transocean Encourage in Tyrihans, 22.07.2024 to 12.09.2024 (52 days), to 6 289,0 m.
Water depth270,0 m
Total depth6 289,0 m MD
Vertical depth3 836,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigTransocean Encourage
Spud22.07.2024
Completed12.09.2024
OperatorEquinor Energy AS
Position64,7898 N, 7,0117 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tyrihans gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 135 °C |
The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/1-C-4 H | 0,0 | - | - | - | - |
| 6407/1-C-2 AY1H | 0,0 | 5 601,0 | - | - | 2009 |
| 6407/1-C-2 AY2H | 0,0 | 6 185,0 | - | - | 2009 |
| 6407/1-C-2 H | 0,0 | 4 611,0 | - | - | 2009 |
| 6407/1-C-3 AY1H | 0,0 | 6 549,0 | - | - | 2010 |
| 6407/1-C-3 AY2H | 0,0 | 5 890,0 | - | - | 2010 |
| 6407/1-C-3 Y1H | 0,0 | 4 557,0 | - | - | 2009 |
| 6406/3-D-3 AY1H | 1,5 | 6 958,0 | - | - | 2012 |
Casing and formation tests
No casing programme is reported for this wellbore.