Fields / 6407/9-13
6407/9-13
Exploration, wildcatPlugged and abandonedDry
Drilled by Equinor Energy AS with West Hercules, 31.12.2021 to 14.02.2022 (45 days), to 2 350,0 m in the Ror Formation.
Water depth270,0 m
Total depth2 350,0 m MD
Vertical depth2 350,0 m TVD
Bottom-hole temperature81 °C
Max inclination1,5°
Rotary table31,0 m
Formation at total depthRor Formation
RigWest Hercules
Spud31.12.2021
Completed14.02.2022
OperatorEquinor Energy AS
Position64,4396 N, 7,6871 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 81 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/8-4 A | 2,0 | 2 473,0 | - | 1,50 | 2008 |
| 6407/8-4 S | 2,0 | 2 788,0 | 104 °C | 1,46 | 2008 |
| 6407/9-9 | 4,0 | 1 920,0 | 70 °C | 1,36 | 1999 |
| 6407/9-H-1 H | 4,4 | 1 749,0 | - | - | 2022 |
| 6407/9-B-5 H | 6,8 | 2 811,0 | - | - | 1993 |
| 6407/9-B-2 H | 6,8 | 2 280,0 | - | - | 1993 |
| 6407/9-B-1 H | 6,8 | 2 130,0 | - | - | 1993 |
| 6407/9-2 | 7,1 | 1 865,0 | 50 °C | 1,42 | 1984 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 343,5 | 42" | 346,0 | - |
| Intermediate | 13 3/8" | 946,7 | 17 1/2" | 953,0 | 1,65 FIT |
| Liner | 9 5/8" | 1 944,4 | 12 1/4" | 1 946,5 | 1,85 XLO |
Mud weight
8 measurements, one dot each, 1,10 to 1,50 g/cm³ against measured depth, glydril, glydril plus, spud mud.