Fields / 6407/9-U-5
6407/9-U-5
Other, soil drillingPlugged and abandoned
Drilled by A/S Norske Shell, 29.08.1986 to 29.08.1986 (0 days).
Water depth-
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
Rig-
Spud29.08.1986
Completed29.08.1986
OperatorA/S Norske Shell
Position64,3613 N, 7,7748 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/9-U-1 | 0,7 | - | - | - | - |
| 6407/9-U-6 | 0,7 | - | - | - | 1986 |
| 6407/9-1 | 0,8 | 2 500,0 | 99 °C | 1,35 | 1984 |
| 6407/9-U-10 | 0,9 | - | - | - | - |
| 6407/9-U-11 | 0,9 | - | - | - | - |
| 6407/9-U-12 | 0,9 | - | - | - | - |
| 6407/9-U-13 | 0,9 | - | - | - | - |
| 6407/9-U-8 | 0,9 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.