Fields / Åsgard / 6506/12-6
6506/12-6
Exploration, appraisalPlugged and abandonedGas and condensate
Drilled by Den norske stats oljeselskap a.s with Dyvi Delta in Åsgard, 31.03.1986 to 02.08.1986 (124 days), to 4 741,0 m in the Åre Formation.
Water depth272,0 m
Total depth4 741,0 m MD
Vertical depth4 738,0 m TVD
Bottom-hole temperature167 °C
Max inclination5,3°
Rotary table29,0 m
Formation at total depthÅre Formation
RigDyvi Delta
Spud31.03.1986
Completed02.08.1986
OperatorDen norske stats oljeselskap a.s
Position65,1660 N, 6,7787 E
Formations
28 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 167 °C |
| Drill-stem test at 4 525,0 m | 158 °C |
| Åsgard gradient | 36,0 °C/km |
| Estimated at total depth from the gradient | 164 °C |
The gradient is the median of 21 released wells in Åsgard with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6506/12-M-2 AH | 1,3 | 5 560,0 | - | - | 2006 |
| 6506/12-M-2 H | 1,3 | 5 218,0 | - | - | 2001 |
| 6506/12-M-3 H | 1,3 | 6 780,0 | - | - | 2000 |
| 6506/12-M-1 AH | 1,3 | 6 435,0 | - | - | 2017 |
| 6506/12-M-1 H | 1,3 | 5 065,0 | - | - | 2001 |
| 6506/12-M-4 H | 1,3 | 6 500,0 | - | - | 2001 |
| 6506/12-U-6 | 2,0 | - | - | - | - |
| 6506/12-J-4 H | 2,1 | 5 522,0 | - | - | 2000 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 412,0 | 36" | 949,0 | - |
| Surface casing | 20" | 1 046,0 | 26" | 1 078,0 | 1,62 LOT |
| Intermediate | 13 3/8" | 2 249,0 | 17 1/2" | 2 408,0 | 1,87 LOT |
| Intermediate | 9 5/8" | 4 150,0 | 12 1/4" | 4 161,0 | 2,07 LOT |
| Liner | 7" | 4 740,0 | 8 1/2" | 4 741,0 | - |
Mud weight
73 measurements, one dot each, 1,10 to 1,70 g/cm³ against measured depth, water based, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3 | 4 312,0 - 4 352,0 | 20,6 | 40,0 | 154 | 376 | 610 000 |
| 2 | 4 464,0 - 4 493,0 | 6,4 | - | - | - | - |
| 2.1 | 4 464,0 - 4 493,0 | 6,4 | - | - | - | - |
| 1 | 4 514,0 - 4 525,0 | 9,5 | - | 158 | 128 | 41 000 |
| 1.2 | 4 514,0 - 4 525,0 | 9,5 | - | - | 128 | 44 000 |
| 1.4 | 4 514,0 - 4 525,0 | - | - | - | - | - |
| 1.6 | 4 514,0 - 4 525,0 | 9,5 | - | - | 100 | 15 000 |
| 1.8 | 4 514,0 - 4 525,0 | 12,7 | 26,0 | - | 155 | 70 000 |
| 1.1 | 4 549,0 - 4 592,0 | 9,5 | - | - | 128 | 58 000 |
| 1.3 | 4 549,0 - 4 592,0 | 9,5 | - | - | 128 | 44 000 |
| 1.5 | 4 549,0 - 4 592,0 | - | - | - | - | - |
| 1.7 | 4 549,0 - 4 592,0 | 9,5 | - | - | 100 | 15 000 |
| 1.9 | 4 549,0 - 4 592,0 | 12,7 | 26,0 | - | 155 | 70 000 |