Fields / Åsgard / 6506/12-9 S
6506/12-9 S
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Den norske stats oljeselskap a.s with Ross Isle in Åsgard, 04.04.1993 to 10.09.1993 (159 days), to 4 910,0 m in the Åre Formation.
Water depth294,0 m
Total depth4 910,0 m MD
Vertical depth4 903,0 m TVD
Bottom-hole temperature166 °C
Max inclination9,3°
Rotary table23,0 m
Formation at total depthÅre Formation
RigRoss Isle
Spud04.04.1993
Completed10.09.1993
OperatorDen norske stats oljeselskap a.s
Position65,1145 N, 6,7544 E
Formations
28 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 166 °C |
| Drill-stem test at 4 834,0 m | 163 °C |
| Åsgard gradient | 36,0 °C/km |
| Estimated at total depth from the gradient | 169 °C |
The gradient is the median of 21 released wells in Åsgard with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6506/12-L-2 AH | 3,0 | 5 811,0 | - | - | 1999 |
| 6506/12-L-2 H | 3,0 | 5 005,0 | - | - | 1997 |
| 6506/12-L-3 H | 3,0 | 5 092,0 | - | - | 1998 |
| 6506/12-L-4 H | 3,0 | 5 260,0 | - | - | 1999 |
| 6506/12-L-1 H | 3,0 | 6 710,0 | - | - | 1997 |
| 6506/12-K-4 H | 3,1 | 6 252,0 | - | - | 2011 |
| 6506/12-K-1 H | 3,1 | 5 208,0 | - | - | 1998 |
| 6506/12-K-3 H | 3,1 | 4 664,0 | - | - | 1997 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 378,0 | 36" | 378,0 | - |
| Intermediate | 20" | 790,0 | 26" | 790,0 | 1,52 LOT |
| Intermediate | 13 3/8" | 2 228,0 | 17 1/2" | 2 230,0 | 1,89 LOT |
| Intermediate | 9 5/8" | 4 363,0 | 12 1/4" | 4 365,0 | 1,87 LOT |
| Liner | 7" | 4 910,0 | 8 1/2" | 4 910,0 | - |
Mud weight
66 measurements, one dot each, 1,00 to 1,75 g/cm³ against measured depth, dummy, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 5 | 4 477,0 - 4 510,0 | 43,6 | - | - | 17 | 33 000 |
| 4 | 4 730,0 - 4 712,0 | - | - | - | - | - |
| 3 | 4 742,0 - 4 751,0 | 17,5 | - | 164 | 567 | 138 000 |
| 2 | 4 805,0 - 4 834,0 | 22,2 | - | 163 | 900 | 249 000 |
| 1 | 4 846,0 - 4 876,0 | 17,5 | - | - | 840 | 444 000 |