Fields / Åsgard / 6506/12-P-4 AH
6506/12-P-4 AH
Development, productionPluggedOil
Drilled by StatoilHydro Petroleum AS with Stena Don in Åsgard, 22.06.2009 to 03.08.2009 (42 days), to 5 615,0 m.
Water depth311,0 m
Total depth5 615,0 m MD
Vertical depth4 254,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigStena Don
Spud22.06.2009
Completed03.08.2009
OperatorStatoilHydro Petroleum AS
Position65,0230 N, 6,8795 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Åsgard gradient | 36,0 °C/km |
| Estimated at total depth from the gradient | 145 °C |
The gradient is the median of 21 released wells in Åsgard with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6506/12-P-4 BH same well | 0,0 | 4 535,0 | - | - | 2023 |
| 6506/12-P-4 H same well | 0,0 | 4 024,0 | - | - | 2001 |
| 6506/12-P-1 AH | 0,0 | 5 162,0 | - | - | 2011 |
| 6506/12-P-1 BH | 0,0 | 6 799,0 | - | - | 2011 |
| 6506/12-P-1 CH | 0,0 | 6 000,0 | - | - | 2019 |
| 6506/12-P-1 H | 0,0 | 4 845,0 | - | - | 1998 |
| 6506/12-P-3 AH | 0,0 | 6 540,0 | - | - | 1997 |
| 6506/12-P-3 BH | 0,0 | 5 269,0 | - | - | 2023 |
Casing and formation tests
No casing programme is reported for this wellbore.