Fields / Åsgard / 6506/12-Q-5 Y1H
6506/12-Q-5 Y1H
Development, productionPluggedGas and condensate
Drilled by StatoilHydro Petroleum AS with Scarabeo 5 in Åsgard, 28.10.2006 to 11.11.2009 (1110 days), to 6 620,0 m.
Water depth305,0 m
Total depth6 620,0 m MD
Vertical depth3 898,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud28.10.2006
Completed11.11.2009
OperatorStatoilHydro Petroleum AS
Position65,0405 N, 6,9410 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Åsgard gradient | 36,0 °C/km |
| Estimated at total depth from the gradient | 132 °C |
The gradient is the median of 21 released wells in Åsgard with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6506/12-Q-5 Y2H same well | 0,0 | 6 689,0 | - | - | 2009 |
| 6506/12-Q-4 AY1H | 0,0 | 6 931,0 | - | - | 2007 |
| 6506/12-Q-4 AY2H | 0,0 | 6 266,0 | - | - | 2007 |
| 6506/12-Q-4 H | 0,0 | 4 816,0 | - | - | 2006 |
| 6506/12-Q-3 AH | 0,0 | 6 363,0 | - | - | 2005 |
| 6506/12-Q-3 BH | 0,0 | 6 717,0 | - | - | 2014 |
| 6506/12-Q-3 H | 0,0 | 5 102,0 | - | - | 2005 |
| 6506/12-Q-1 AY1H | 0,0 | 6 235,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.