6507/5-5
Exploration, appraisalPlugged and abandonedOil
Drilled by BP Amoco Norge AS with West Alpha in Skarv, 28.11.2001 to 14.02.2002 (78 days), to 3 948,0 m in the Åre Formation.
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 155 °C |
| Drill-stem test at 3 706,0 m | 133 °C |
| Skarv gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 136 °C |
The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/5-B-10 AH | 0,3 | 5 283,0 | - | - | 2011 |
| 6507/5-B-10 H | 0,3 | 5 450,0 | - | - | 2010 |
| 6507/5-B-9 H | 0,3 | 4 510,0 | - | - | 2010 |
| 6507/5-B-8 H | 0,3 | 4 695,0 | - | - | 2011 |
| 6507/5-B-5 AH | 0,3 | 5 622,0 | - | - | 2013 |
| 6507/5-B-5 H | 0,3 | 4 124,0 | - | - | 2010 |
| 6507/5-B-6 H | 0,3 | 5 535,0 | - | - | 2010 |
| 6507/5-B-7 AH | 0,3 | 5 439,0 | - | - | 2021 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 466,0 | 36" | 471,0 | - |
| Intermediate | 20" | 1 051,0 | 26" | 1 060,0 | 1,56 LOT |
| Intermediate | 13 3/8" | 2 100,0 | 17 1/2" | 2 106,0 | 1,90 LOT |
| Liner | 9 5/8" | 3 642,0 | 12 1/4" | 3 643,0 | - |
| Liner | 7" | 3 948,0 | 8 1/2" | 3 948,0 | - |
Mud weight
6 measurements, one dot each, 0,10 to 1,63 g/cm³ against measured depth, kcl, spud mud, water/brine.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 3 561,0 - 3 706,0 | 25,0 | - | 133 | 940 | 164 256 |