6507/5-J-2 H
Development, injectionProducingGas
Drilled by BP Norge AS with Borgland Dolphin in Skarv, 20.06.2010 to 15.09.2012 (818 days), to 4 138,0 m.
Water depth325,0 m
Total depth4 138,0 m MD
Vertical depth3 662,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigBorgland Dolphin
Spud20.06.2010
Completed15.09.2012
OperatorBP Norge AS
Position65,7383 N, 7,6515 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Skarv gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/5-J-1 H | 0,0 | 5 105,0 | - | - | 2010 |
| 6507/5-J-3 H | 0,0 | 3 852,0 | - | - | 2010 |
| 6507/5-J-4 H | 0,0 | 5 500,0 | - | - | 2012 |
| 6507/5-U-1 | 0,0 | 1 130,0 | - | - | 2010 |
| 6507/5-U-2 | 0,2 | 1 130,0 | - | - | 2010 |
| 6507/5-6 S | 0,2 | 4 991,0 | - | 1,60 | 2010 |
| 6507/5-A-1 H | 0,2 | 5 017,0 | - | - | 2011 |
| 6507/5-A-6 H | 0,2 | 4 671,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.