Fields / 6507/5-U-4
6507/5-U-4
Other, shallow gasPlugged and abandoned
Drilled by Aker BP ASA with Scarabeo 8, 31.07.2024 to 01.08.2024 (1 days), to 1 346,0 m.
Water depth376,0 m
Total depth1 346,0 m MD
Vertical depth1 346,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud31.07.2024
Completed01.08.2024
OperatorAker BP ASA
Position65,7036 N, 7,5896 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/5-B-3 H | 0,0 | 3 812,0 | - | - | 2010 |
| 6507/5-U-3 | 0,0 | 1 228,0 | - | - | 2010 |
| 6507/5-B-2 H | 0,0 | 3 850,0 | - | - | 2010 |
| 6507/5-B-10 AH | 0,1 | 5 283,0 | - | - | 2011 |
| 6507/5-B-10 H | 0,1 | 5 450,0 | - | - | 2010 |
| 6507/5-B-5 AH | 0,1 | 5 622,0 | - | - | 2013 |
| 6507/5-B-5 H | 0,1 | 4 124,0 | - | - | 2010 |
| 6507/5-B-9 H | 0,1 | 4 510,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.