Fields / Heidrun / 6507/7-3
6507/7-3
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Conoco Norway Inc. with Nortrym in Heidrun, 29.07.1985 to 18.09.1985 (51 days), to 2 850,0 m in the Åre Formation.
Water depth346,0 m
Total depth2 850,0 m MD
Vertical depth2 850,0 m TVD
Bottom-hole temperature98 °C
Max inclination1,8°
Rotary table25,0 m
Formation at total depthÅre Formation
RigNortrym
Spud29.07.1985
Completed18.09.1985
OperatorConoco Norway Inc.
Position65,3170 N, 7,2958 E
Formations
17 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 98 °C |
| Drill-stem test at 2 430,0 m | 88 °C |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 98 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6507/7-U-6 | 1,3 | 375,5 | - | - | 1987 |
| 6507/7-9 | 1,4 | 850,0 | - | 1,03 | 1987 |
| 6507/7-A-49 | 1,4 | 4 765,0 | - | - | 2004 |
| 6507/7-A-41 | 1,4 | 3 636,0 | - | - | 2001 |
| 6507/7-A-41 A | 1,4 | 3 787,0 | - | - | 2008 |
| 6507/7-A-41 B | 1,4 | 2 952,0 | - | - | 2016 |
| 6507/7-A-50 | 1,4 | 3 628,0 | - | - | 1993 |
| 6507/7-A-50 A | 1,4 | 5 171,0 | - | - | 2003 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 469,0 | 36" | 469,0 | - |
| Surface casing | 20" | 1 024,0 | 26" | 1 030,0 | 1,49 LOT |
| Intermediate | 13 3/8" | 2 291,0 | 17 1/2" | 2 307,0 | 1,75 LOT |
| Intermediate | 13 3/8" | 2 307,0 | 17 1/2" | 2 360,0 | 1,75 LOT |
| Intermediate | 9 5/8" | 2 832,0 | 12 1/4" | 2 850,0 | - |
Mud weight
32 measurements, one dot each, 1,00 to 1,39 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3 | 2 368,0 - 2 380,0 | 25,4 | 25,0 | 85 | 823 | 89 510 |
| 2 | 2 385,0 - 2 400,0 | 24,0 | 25,0 | 87 | 870 | 93 021 |
| 1 | 2 413,0 - 2 430,0 | 21,0 | 25,0 | 88 | 772 | 86 027 |