WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-A-14

6507/7-A-14

Development, productionPluggedOil

Drilled by Den norske stats oljeselskap a.s with Transocean 8 in Heidrun, 04.11.1993 to 01.01.1995 (423 days), to 2 904,0 m.

Water depth346,6 m
Total depth2 904,0 m MD
Vertical depth2 660,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigTransocean 8
Spud04.11.1993
Completed01.01.1995
OperatorDen norske stats oljeselskap a.s
Position65,3258 N, 7,3177 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient91 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-A-14 A same well0,03 849,0--2014
6507/7-A-14 B same well0,03 807,0--2014
6507/7-A-14 C same well0,03 616,0--2019
6507/7-A-130,03 522,0--1999
6507/7-A-13 A0,04 389,0--2019
6507/7-A-60,04 601,0--2001
6507/7-A-6 A0,04 072,0--2018
6507/7-A-220,03 300,0--1998

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗