WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-A-2

6507/7-A-2

Development, productionPluggedOil and gas

Drilled by StatoilHydro Petroleum AS with Heidrun in Heidrun, 03.06.2009 to 31.03.2010 (301 days), to 5 369,0 m.

Water depth345,6 m
Total depth5 369,0 m MD
Vertical depth2 560,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud03.06.2009
Completed31.03.2010
OperatorStatoilHydro Petroleum AS
Position65,3258 N, 7,3174 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient85 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-A-2 A same well0,05 210,0--2015
6507/7-A-100,04 691,0--2002
6507/7-A-10,04 978,0--2015
6507/7-A-1 A0,05 062,0--2019
6507/7-A-90,03 985,0--1996
6507/7-A-9 A0,03 582,0--2000
6507/7-A-9 B0,03 813,0--2000
6507/7-A-9 C0,03 429,0--2019

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗