Fields / Heidrun / 6507/7-A-29
6507/7-A-29
Development, productionPluggedOil
Drilled by Conoco Norway Inc. with Transocean 8 in Heidrun, 16.08.1993 to 10.12.1993 (116 days), to 4 138,0 m.
Water depth346,0 m
Total depth4 138,0 m MD
Vertical depth2 608,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigTransocean 8
Spud16.08.1993
Completed10.12.1993
OperatorConoco Norway Inc.
Position65,3258 N, 7,3177 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 89 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-29 AY1 same well | 0,0 | 5 304,0 | - | - | 2005 |
| 6507/7-A-29 AY2 same well | 0,0 | 4 886,0 | - | - | 2005 |
| 6507/7-A-37 | 0,0 | 5 350,0 | - | - | 1998 |
| 6507/7-A-30 | 0,0 | 3 565,0 | - | - | 2002 |
| 6507/7-A-30 A | 0,0 | 3 565,0 | - | - | 2002 |
| 6507/7-A-30 B | 0,0 | 3 707,0 | - | - | 2007 |
| 6507/7-A-30 C | 0,0 | 3 515,0 | - | - | 2007 |
| 6507/7-A-30 D | 0,0 | 5 413,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.