Fields / Heidrun / 6507/7-A-3 A
6507/7-A-3 A
Development, injectionInjectingWater
Drilled by Statoil Petroleum AS with Heidrun in Heidrun, 12.10.2017 to 04.11.2017 (23 days), to 5 048,0 m.
Water depth345,6 m
Total depth5 048,0 m MD
Vertical depth2 465,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud12.10.2017
Completed04.11.2017
OperatorStatoil Petroleum AS
Position65,3258 N, 7,3175 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-3 same well | 0,0 | 5 021,0 | - | - | 2011 |
| 6507/7-A-11 | 0,0 | 5 364,0 | - | - | 2006 |
| 6507/7-A-11 A | 0,0 | 5 428,0 | - | - | 2006 |
| 6507/7-A-11 B | 0,0 | 5 363,0 | - | - | 2006 |
| 6507/7-A-11 C | 0,0 | 5 360,0 | - | - | 2022 |
| 6507/7-A-4 | 0,0 | 3 483,0 | - | - | 2021 |
| 6507/7-A-12 | 0,0 | 4 320,0 | - | - | 2004 |
| 6507/7-A-12 A | 0,0 | 4 045,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.