Fields / Heidrun / 6507/7-A-34 B
6507/7-A-34 B
Development, injectionClosedWater
Drilled by Statoil Petroleum AS with Heidrun in Heidrun, 27.06.2018 to 03.07.2018 (6 days), to 3 983,0 m.
Water depth345,6 m
Total depth3 983,0 m MD
Vertical depth2 642,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud27.06.2018
Completed03.07.2018
OperatorStatoil Petroleum AS
Position65,3257 N, 7,3174 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 88 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-34 same well | 0,0 | 3 891,0 | - | - | 2003 |
| 6507/7-A-34 A same well | 0,0 | 4 220,0 | - | - | 2003 |
| 6507/7-A-26 | 0,0 | 4 402,0 | - | - | 1999 |
| 6507/7-A-26 A | 0,0 | 4 021,0 | - | - | 2009 |
| 6507/7-A-26 B | 0,0 | - | - | - | - |
| 6507/7-A-33 | 0,0 | 3 699,0 | - | - | 1992 |
| 6507/7-A-33 A | 0,0 | 3 366,0 | - | - | 2013 |
| 6507/7-A-33 B | 0,0 | 3 205,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.