Fields / Heidrun / 6507/7-A-36 A
6507/7-A-36 A
Development, productionPluggedOil
Drilled by StatoilHydro ASA with Heidrun in Heidrun, 29.08.2008 to 26.10.2008 (58 days), to 3 508,0 m.
Water depth345,6 m
Total depth3 508,0 m MD
Vertical depth2 516,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud29.08.2008
Completed26.10.2008
OperatorStatoilHydro ASA
Position65,3257 N, 7,3176 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 83 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-36 same well | 0,0 | 4 398,0 | - | - | 1993 |
| 6507/7-A-36 B same well | 0,0 | 3 638,0 | - | - | 2016 |
| 6507/7-A-28 | 0,0 | 3 005,0 | - | - | 1992 |
| 6507/7-A-28 A | 0,0 | 2 853,0 | - | - | 2005 |
| 6507/7-A-28 B | 0,0 | 2 360,0 | - | - | 2013 |
| 6507/7-A-28 C | 0,0 | 2 817,0 | - | - | 2013 |
| 6507/7-A-28 D | 0,0 | 3 650,0 | - | - | 2022 |
| 6507/7-A-35 | 0,0 | 3 684,0 | - | - | 1992 |
Casing and formation tests
No casing programme is reported for this wellbore.