WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-A-45 A

6507/7-A-45 A

Development, productionPluggedOil

Drilled by Statoil Petroleum AS with Heidrun in Heidrun, 09.06.2011 to 17.06.2011 (8 days), to 3 310,0 m.

Water depth345,6 m
Total depth3 310,0 m MD
Vertical depth2 469,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,0 m
Formation at total depth-
RigHeidrun
Spud09.06.2011
Completed17.06.2011
OperatorStatoil Petroleum AS
Position65,3257 N, 7,3177 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient81 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-A-45 same well0,04 500,0--1993
6507/7-A-45 B same well0,03 421,0--2016
6507/7-A-530,03 640,0--1992
6507/7-A-53 A0,03 419,0--2017
6507/7-A-370,05 350,0--1998
6507/7-A-540,04 695,0--2003
6507/7-A-54 A0,03 439,5--2024
6507/7-A-380,02 963,0--1994

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗