Fields / Heidrun / 6507/7-A-45 A
6507/7-A-45 A
Development, productionPluggedOil
Drilled by Statoil Petroleum AS with Heidrun in Heidrun, 09.06.2011 to 17.06.2011 (8 days), to 3 310,0 m.
Water depth345,6 m
Total depth3 310,0 m MD
Vertical depth2 469,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,0 m
Formation at total depth-
RigHeidrun
Spud09.06.2011
Completed17.06.2011
OperatorStatoil Petroleum AS
Position65,3257 N, 7,3177 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-45 same well | 0,0 | 4 500,0 | - | - | 1993 |
| 6507/7-A-45 B same well | 0,0 | 3 421,0 | - | - | 2016 |
| 6507/7-A-53 | 0,0 | 3 640,0 | - | - | 1992 |
| 6507/7-A-53 A | 0,0 | 3 419,0 | - | - | 2017 |
| 6507/7-A-37 | 0,0 | 5 350,0 | - | - | 1998 |
| 6507/7-A-54 | 0,0 | 4 695,0 | - | - | 2003 |
| 6507/7-A-54 A | 0,0 | 3 439,5 | - | - | 2024 |
| 6507/7-A-38 | 0,0 | 2 963,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.