WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-C-3 H

6507/7-C-3 H

Development, injectionClosedWater

Drilled by Conoco Norway Inc. with Transocean 8 in Heidrun, 17.05.1994 to 12.07.1994 (56 days), to 3 586,0 m.

Water depth327,0 m
Total depth3 586,0 m MD
Vertical depth2 980,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigTransocean 8
Spud17.05.1994
Completed12.07.1994
OperatorConoco Norway Inc.
Position65,2864 N, 7,3030 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient103 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-C-1 H0,03 317,0--1994
6507/7-C-2 H0,03 103,0--1994
6507/7-C-4 AH0,03 032,0--2003
6507/7-C-4 H0,03 098,0--1999
6507/7-U-90,9361,5--1991
6507/7-71,41 035,0-1,041987
6507/7-81,42 855,096 °C1,421987
6507/7-U-22,0358,0--1985

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗