Fields / Heidrun / 6507/8-D-1 BH
6507/8-D-1 BH
Development, productionProducingOil
Drilled by Statoil Petroleum AS with Songa Encourage in Heidrun, 12.01.2018 to 31.01.2018 (19 days), to 3 533,0 m.
Water depth357,0 m
Total depth3 533,0 m MD
Vertical depth2 413,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigSonga Encourage
Spud12.01.2018
Completed31.01.2018
OperatorStatoil Petroleum AS
Position65,3618 N, 7,3359 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 80 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-D-1 AH same well | 0,0 | 3 390,0 | - | - | 2010 |
| 6507/8-D-1 H same well | 0,0 | 3 330,0 | - | - | 2000 |
| 6507/8-D-4 AH | 0,0 | 3 890,0 | - | - | 2001 |
| 6507/8-D-4 BH | 0,0 | 3 880,0 | - | - | 2001 |
| 6507/8-D-4 CH | 0,0 | 3 701,0 | - | - | 2026 |
| 6507/8-D-4 DH | 0,0 | 3 044,0 | - | - | 2026 |
| 6507/8-D-4 H | 0,0 | 3 198,0 | - | - | 2001 |
| 6507/8-D-2 AH | 0,0 | 3 643,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.