Fields / Heidrun / 6507/8-D-3 BH
6507/8-D-3 BH
Development, productionPluggedOil
Drilled by Statoil ASA (old) with Transocean Searcher in Heidrun, 07.04.2005 to 23.05.2005 (46 days), to 4 009,0 m.
Water depth357,0 m
Total depth4 009,0 m MD
Vertical depth2 427,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Searcher
Spud07.04.2005
Completed23.05.2005
OperatorStatoil ASA (old)
Position65,3619 N, 7,3360 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-D-3 AH same well | 0,0 | 3 180,0 | - | - | 2001 |
| 6507/8-D-3 CH same well | 0,0 | 3 998,0 | - | - | 2011 |
| 6507/8-D-3 H same well | 0,0 | 3 128,0 | - | - | 1999 |
| 6507/8-D-2 AH | 0,0 | 3 643,0 | - | - | 2009 |
| 6507/8-D-2 BH | 0,0 | 3 735,0 | - | - | 2009 |
| 6507/8-D-2 CH | 0,0 | 3 609,0 | - | - | 2009 |
| 6507/8-D-2 DH | 0,0 | 3 996,0 | - | - | 2019 |
| 6507/8-D-2 H | 0,0 | 3 590,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.