Fields / Heidrun / 6507/8-E-3 AH
6507/8-E-3 AH
Development, observationPlugged
Drilled by Den norske stats oljeselskap a.s with Mærsk Jutlander in Heidrun, 05.09.2000 to 23.09.2000 (18 days), to 2 970,0 m.
Water depth355,0 m
Total depth2 970,0 m MD
Vertical depth2 334,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud05.09.2000
Completed23.09.2000
OperatorDen norske stats oljeselskap a.s
Position65,3833 N, 7,3695 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-E-3 BH same well | 0,0 | 3 562,0 | - | - | 2000 |
| 6507/8-E-3 CH same well | 0,0 | 4 340,0 | - | - | 2000 |
| 6507/8-E-3 DH same well | 0,0 | 3 191,0 | - | - | 2001 |
| 6507/8-E-3 EH same well | 0,0 | 2 655,0 | - | - | 2009 |
| 6507/8-E-3 FH same well | 0,0 | 2 744,0 | - | - | 2009 |
| 6507/8-E-3 GH same well | 0,0 | 2 745,0 | - | - | 2019 |
| 6507/8-E-3 H same well | 0,0 | 2 508,0 | - | - | 2000 |
| 6507/8-E-3 HH same well | 0,0 | 4 089,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.