Fields / 6608/10-16
6608/10-16
Exploration, wildcatPlugged and abandonedShows
Drilled by Noreco Norway AS with Bredford Dolphin, 08.04.2014 to 13.06.2014 (66 days), to 4 025,0 m in the Åre Formation.
Water depth371,0 m
Total depth4 025,0 m MD
Vertical depth4 025,0 m TVD
Bottom-hole temperature144 °C
Max inclination2,4°
Rotary table25,0 m
Formation at total depthÅre Formation
RigBredford Dolphin
Spud08.04.2014
Completed13.06.2014
OperatorNoreco Norway AS
Position66,1439 N, 8,0669 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 144 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6608/10-18 | 4,6 | 3 469,0 | 131 °C | 1,58 | 2018 |
| 6608/10-18 A | 4,6 | 3 474,0 | - | 1,58 | 2018 |
| 6608/10-18 B | 4,6 | 3 585,0 | - | 1,58 | 2018 |
| 6608/10-1 | 5,5 | 3 437,0 | 110 °C | 1,67 | 1989 |
| 6608/10-V-3 H | 5,8 | 6 155,0 | - | - | 2025 |
| 6608/10-V-2 H | 5,8 | 5 579,0 | - | - | 2024 |
| 6608/10-V-4 H | 5,8 | 5 643,0 | - | - | 2024 |
| 6607/12-3 | 5,9 | 4 306,0 | 159 °C | 1,80 | 2012 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 462,0 | 36" | 465,0 | - |
| Surface casing | 20" | 684,0 | 26" | 691,0 | - |
| Pilot hole | - | 734,0 | 9 7/8" | 734,0 | - |
| Intermediate | 13 3/8" | 1 561,0 | 17 1/2" | 1 575,0 | - |
| Intermediate | 9 5/8" | 3 349,0 | 12 1/4" | 3 349,0 | - |
| Open hole | - | 4 025,0 | 8 1/2" | 4 025,0 | - |
Mud weight
8 measurements, one dot each, 1,20 to 1,59 g/cm³ against measured depth, aquadrill, aquadrill, carbo-sea, spud mud, spud mud.