Fields / Norne / 6608/10-2
6608/10-2
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Den norske stats oljeselskap a.s with Ross Rig (2) in Norne, 28.10.1991 to 29.01.1992 (93 days), to 3 678,0 m in the Åre Formation.
Water depth374,0 m
Total depth3 678,0 m MD
Vertical depth3 677,0 m TVD
Bottom-hole temperature133 °C
Max inclination4,0°
Rotary table23,0 m
Formation at total depthÅre Formation
RigRoss Rig (2)
Spud28.10.1991
Completed29.01.1992
OperatorDen norske stats oljeselskap a.s
Position66,0137 N, 8,0740 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 133 °C |
| Drill-stem test at 2 720,0 m | 100 °C |
| Norne gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 144 °C |
The gradient is the median of 4 released wells in Norne with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6608/10-D-1 AH | 0,7 | 3 897,0 | - | - | 2002 |
| 6608/10-D-1 BH | 0,7 | 4 852,0 | - | - | 2002 |
| 6608/10-D-1 CH | 0,7 | 4 575,0 | - | - | 2003 |
| 6608/10-D-1 H | 0,7 | 3 500,0 | - | - | 1996 |
| 6608/10-D-2 H | 0,7 | 4 174,0 | - | - | 1996 |
| 6608/10-D-4 AH | 0,7 | 5 829,0 | - | - | 2003 |
| 6608/10-D-4 BH | 0,7 | 3 658,0 | - | - | 2021 |
| 6608/10-D-4 H | 0,7 | 3 137,0 | - | - | 1998 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 459,0 | 36" | 460,0 | - |
| Intermediate | 20" | 867,0 | 26" | 870,0 | 1,41 LOT |
| Intermediate | 13 3/8" | 1 520,0 | 17 1/2" | 1 522,0 | 1,86 LOT |
| Intermediate | 9 5/8" | 2 561,0 | 12 1/4" | 2 564,0 | 1,95 LOT |
| Liner | 7" | 3 330,0 | 8 1/2" | 3 678,0 | 1,82 LOT |
Mud weight
26 measurements, one dot each, 1,00 to 1,64 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3.3 | 2 590,0 - 2 610,0 | 28,0 | - | 95 | - | 945 000 |
| 3.2 | 2 605,0 - 2 610,0 | 19,0 | - | 91 | - | 582 600 |
| 3.1 | 2 673,0 - 2 696,0 | 72,0 | - | 98 | 1 165 | - |
| 1 | 2 715,0 - 2 720,0 | 50,8 | - | 100 | - | - |