Fields / Norne / 6608/10-D-3 CH
6608/10-D-3 CH
Development, productionPluggedDry
Drilled by Statoil Petroleum AS with Songa Encourage in Norne, 16.07.2017 to 22.08.2017 (37 days), to 5 106,0 m.
Water depth376,0 m
Total depth5 106,0 m MD
Vertical depth2 651,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigSonga Encourage
Spud16.07.2017
Completed22.08.2017
OperatorStatoil Petroleum AS
Position66,0137 N, 8,0577 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Norne gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 100 °C |
The gradient is the median of 4 released wells in Norne with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6608/10-D-3 AH same well | 0,0 | 5 100,0 | - | - | 2000 |
| 6608/10-D-3 BY1H same well | 0,0 | 5 400,0 | - | - | 2005 |
| 6608/10-D-3 BY2H same well | 0,0 | 5 400,0 | - | - | 2005 |
| 6608/10-D-3 H same well | 0,0 | 4 198,0 | - | - | 2000 |
| 6608/10-D-4 AH | 0,0 | 5 829,0 | - | - | 2003 |
| 6608/10-D-4 BH | 0,0 | 3 658,0 | - | - | 2021 |
| 6608/10-D-4 H | 0,0 | 3 137,0 | - | - | 1998 |
| 6608/10-D-2 H | 0,0 | 4 174,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.