6608/10-H-4 AH
Development, injectionClosedWater
Drilled by Statoil Petroleum AS with Aker Spitsbergen in Urd, 20.07.2011 to 03.10.2011 (75 days), to 2 174,0 m.
Water depth376,0 m
Total depth2 174,0 m MD
Vertical depth2 078,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigAker Spitsbergen
Spud20.07.2011
Completed03.10.2011
OperatorStatoil Petroleum AS
Position66,0776 N, 8,2510 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Urd gradient | 41,7 °C/km |
| Estimated at total depth from the gradient | 73 °C |
The gradient is the median of 9 released wells in Urd with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6608/10-H-4 H same well | 0,0 | 1 841,0 | - | - | 2011 |
| 6608/10-H-1 AH | 0,0 | 2 472,0 | - | - | 2007 |
| 6608/10-H-1 BH | 0,0 | 2 446,0 | - | - | 2015 |
| 6608/10-H-1 H | 0,0 | 3 129,0 | - | - | 2004 |
| 6608/10-H-3 AH | 0,0 | 3 333,0 | - | - | 2016 |
| 6608/10-H-3 H | 0,0 | 2 548,0 | - | - | 2004 |
| 6608/10-H-2 H | 0,0 | 2 162,0 | - | - | 2008 |
| 6608/10-G-4 AH | 0,1 | 3 565,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.