Fields / 6609/11-1
6609/11-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with Treasure Seeker, 19.05.1983 to 07.07.1983 (49 days), to 3 068,0 m in the Åre Formation.
Water depth238,0 m
Total depth3 068,0 m MD
Vertical depth3 067,0 m TVD
Bottom-hole temperature90 °C
Max inclination5,8°
Rotary table25,0 m
Formation at total depthÅre Formation
RigTreasure Seeker
Spud19.05.1983
Completed07.07.1983
OperatorNorsk Hydro Produksjon AS
Position66,1372 N, 9,5633 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 90 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 325,0 | 36" | 332,0 | - |
| Surface casing | 20" | 896,0 | 26" | 915,0 | 1,58 LOT |
| Intermediate | 13 3/8" | 1 849,0 | 17 1/2" | 1 864,0 | 2,00 LOT |
| Open hole | - | 3 068,0 | 12 1/4" | 3 068,0 | - |
Mud weight
8 measurements, one dot each, 1,00 to 1,32 g/cm³ against measured depth, spud mud, water based.