Fields / 7/11-14 S
7/11-14 S
Exploration, wildcatPlugged and abandonedOil
Drilled by Aker BP ASA with Maersk Integrator, 10.10.2021 to 31.10.2021 (21 days), to 4 180,0 m in the Bryne Formation.
Water depth71,7 m
Total depth4 180,0 m MD
Vertical depth4 150,0 m TVD
Bottom-hole temperature155 °C
Max inclination9,8°
Rotary table58,7 m
Formation at total depthBryne Formation
RigMaersk Integrator
Spud10.10.2021
Completed31.10.2021
OperatorAker BP ASA
Position57,1035 N, 2,6282 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 155 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Intermediate | 20" | 588,4 | 26" | 594,0 | 1,73 FIT |
| Intermediate | 13 3/8" | 2 016,0 | 16" | 2 023,0 | 1,92 LOT |
| Intermediate | 9 5/8" | 4 024,0 | 12 1/4" | 4 031,0 | 2,04 LOT |
| Open hole | - | 4 181,0 | 8 1/2" | 4 180,0 | - |
Mud weight
7 measurements, one dot each, 1,00 to 1,67 g/cm³ against measured depth, synthetic, water.