7/11-A-7
Development, productionJunked
Drilled by Phillips Petroleum Company Norway with Cod in Cod, 23.08.1976 to 21.10.1976 (59 days), to 3 616,8 m.
Water depth70,0 m
Total depth3 616,8 m MD
Vertical depth3 616,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table42,0 m
Formation at total depth-
RigCod
Spud23.08.1976
Completed21.10.1976
OperatorPhillips Petroleum Company Norway
Position57,0695 N, 2,4347 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Cod gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 132 °C |
The gradient is the median of 5 released wells in Cod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.