7/12-A-14
Development, productionPluggedOil
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 08.12.1992 to 13.02.1993 (67 days), to 3 693,0 m.
Water depth69,0 m
Total depth3 693,0 m MD
Vertical depth3 548,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud08.12.1992
Completed13.02.1993
OperatorBP Norway Limited U.A.
Position57,1115 N, 2,8474 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 138 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-14 A same well | 0,0 | 4 531,0 | - | - | 2001 |
| 7/12-A-8 | 0,0 | 4 393,0 | - | - | 1989 |
| 7/12-A-8 A | 0,0 | 4 450,0 | - | - | 1994 |
| 7/12-A-15 | 0,0 | 3 882,0 | - | - | 1989 |
| 7/12-A-15 A | 0,0 | 3 748,0 | - | - | 2009 |
| 7/12-A-9 | 0,0 | 4 171,0 | - | - | 1989 |
| 7/12-A-9 A | 0,0 | 3 923,0 | - | - | 2006 |
| 7/12-A-9 B | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.