7/4-2
Exploration, appraisalPlugged and abandonedOil
Drilled by Lundin Norway AS with Mærsk Giant in Brynhild, 15.12.2007 to 13.03.2008 (89 days), to 3 459,0 m in the Zechstein Group.
Water depth82,0 m
Total depth3 459,0 m MD
Vertical depth3 458,0 m TVD
Bottom-hole temperature153 °C
Max inclination3,3°
Rotary table43,0 m
Formation at total depthZechstein Group
RigMærsk Giant
Spud15.12.2007
Completed13.03.2008
OperatorLundin Norway AS
Position57,5036 N, 2,3092 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 153 °C |
| Brynhild gradient | 43,0 °C/km |
| Estimated at total depth from the gradient | 147 °C |
The gradient is the median of 3 released wells in Brynhild with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/7-A-4 H | 1,3 | 3 839,0 | - | - | 2015 |
| 7/7-A-1 AH | 1,3 | 4 658,0 | - | - | 2015 |
| 7/7-A-1 BH | 1,3 | - | - | - | - |
| 7/7-A-1 H | 1,3 | 4 293,0 | - | - | 2014 |
| 7/7-A-3 AH | 1,3 | 4 793,0 | - | - | 2014 |
| 7/7-A-3 H | 1,3 | 4 325,0 | - | - | 2013 |
| 7/7-A-2 H | 1,3 | 4 433,0 | - | - | 2013 |
| 7/7-2 | 2,1 | 3 430,0 | 147 °C | 2,04 | 1992 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 208,0 | 36" | 210,0 | - |
| Surface casing | 20" | 950,0 | 26" | 950,0 | 1,96 LOT |
| Intermediate | 13 3/8" | 1 848,0 | 17 1/2" | 1 847,0 | 1,91 LOT |
| Intermediate | 9 5/8" | 3 219,0 | 12 1/4" | 3 229,0 | 2,10 LOT |
| Open hole | - | 3 450,0 | 8 1/2" | 3 458,0 | - |
Mud weight
15 measurements, one dot each, 1,40 to 1,95 g/cm³ against measured depth, oil based, oil based, water based.