Fields / 7/9-1
7/9-1
Exploration, wildcatPlugged and abandonedDry
Drilled by Conoco Norway Inc. with Mærsk Explorer, 22.04.1971 to 29.05.1971 (37 days), to 2 931,0 m in the Zechstein Group.
Water depth70,0 m
Total depth2 931,0 m MD
Vertical depth-
Bottom-hole temperature113 °C
Max inclination5,5°
Rotary table31,0 m
Formation at total depthZechstein Group
RigMærsk Explorer
Spud22.04.1971
Completed29.05.1971
OperatorConoco Norway Inc.
Position57,3436 N, 2,8559 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 113 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 108,0 | 36" | 110,0 | - |
| Surface casing | 20" | 241,0 | 26" | 244,0 | - |
| Intermediate | 13 3/8" | 1 070,0 | 17 1/2" | 1 076,0 | - |
| Intermediate | 9 5/8" | 2 143,0 | 12 1/4" | 2 144,0 | - |
| Open hole | - | 2 931,0 | 8 1/2" | 2 931,0 | - |
Mud weight
7 measurements, one dot each, 1,10 to 1,68 g/cm³ against measured depth, seawater.