Fields / 7018/5-1
7018/5-1
Exploration, wildcatPlugged and abandonedShows
Drilled by Equinor Energy AS with West Hercules, 03.11.2020 to 27.11.2020 (24 days), to 1 130,0 m in the Stø Formation.
Water depth305,5 m
Total depth1 130,0 m MD
Vertical depth1 130,0 m TVD
Bottom-hole temperature46 °C
Max inclination0,5°
Rotary table31,0 m
Formation at total depthStø Formation
RigWest Hercules
Spud03.11.2020
Completed27.11.2020
OperatorEquinor Energy AS
Position70,6738 N, 18,4467 E
Formations
9 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 46 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7018/5-U-8 | 0,0 | 593,0 | - | - | 2020 |
| 7018/5-2 | 0,6 | 1 911,0 | - | - | 2026 |
| 7018/5-U-9 | 0,6 | 868,0 | - | - | 2025 |
| 7018/5-U-7 | 0,8 | 719,0 | - | - | 2020 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 384,4 | 32" | 390,2 | - |
| Intermediate | 13 3/8" | 585,5 | 17 1/2" | 591,0 | 1,42 FIT |
| Intermediate | 9 5/8" | 671,5 | 12 1/4" | 676,0 | 1,50 FIT |
| Liner | 7" | 889,0 | 8 1/2" | 890,0 | 1,41 LOT |
| Open hole | - | 1 130,0 | 6" | 1 130,0 | - |
Mud weight
7 measurements, one dot each, 1,10 to 1,30 g/cm³ against measured depth, glydril, spud mud.