Fields / 7120/12-2
7120/12-2
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Norsk Hydro Produksjon AS with Treasure Seeker, 15.04.1981 to 11.09.1981 (149 days), to 4 680,0 m in the Basement.
Water depth164,0 m
Total depth4 680,0 m MD
Vertical depth4 667,0 m TVD
Bottom-hole temperature115 °C
Max inclination9,2°
Rotary table25,0 m
Formation at total depthBasement
RigTreasure Seeker
Spud15.04.1981
Completed11.09.1981
OperatorNorsk Hydro Produksjon AS
Position71,1251 N, 20,8053 E
Formations
31 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 115 °C |
| Drill-stem test at 2 568,0 m | 77 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 312,0 | 36" | 313,0 | - |
| Surface casing | 20" | 502,0 | 26" | 515,0 | 1,74 LOT |
| Intermediate | 13 3/8" | 1 710,0 | 17 1/2" | 1 724,0 | 1,92 LOT |
| Intermediate | 9 5/8" | 3 101,0 | 12 1/4" | 3 116,0 | 2,08 LOT |
| Open hole | - | 4 680,0 | 8 3/8" | 4 680,0 | - |
Mud weight
10 measurements, one dot each, 1,10 to 1,93 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 3 | 1 944,0 - 1 950,0 | 23,1 | - | 66 | 53 | 758 000 |
| 2 | 1 985,0 - 1 991,0 | 68,3 | - | 66 | - | - |
| 1 | 2 562,0 - 2 568,0 | 25,1 | - | 77 | 25 | 418 000 |