Fields / Goliat / 7122/10-I-4 H
7122/10-I-4 H
Development, injectionClosedWater
Drilled by Eni Norge AS with Scarabeo 8 in Goliat, 28.03.2017 to 21.04.2017 (24 days), to 2 568,0 m.
Water depth324,0 m
Total depth2 568,0 m MD
Vertical depth2 050,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud28.03.2017
Completed21.04.2017
OperatorEni Norge AS
Position71,2424 N, 22,2514 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Goliat gradient | 29,5 °C/km |
| Estimated at total depth from the gradient | 54 °C |
The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/10-I-2 H | 0,0 | 2 510,0 | - | - | 2014 |
| 7122/10-U-1 | 0,1 | 574,0 | - | - | 2010 |
| 7122/10-E-1 H | 0,1 | 4 497,0 | - | - | 2016 |
| 7122/10-E-1 Y2H | 0,1 | 5 226,0 | - | - | 2026 |
| 7122/10-E-4 H | 0,1 | 4 413,0 | - | - | 2018 |
| 7122/10-E-2 H | 0,1 | 3 024,0 | - | - | 2015 |
| 7122/10-E-2 Y2H | 0,1 | 3 528,0 | - | - | 2025 |
| 7122/10-E-3 H | 0,1 | 3 800,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.