Fields / Goliat / 7122/7-B-1 H
7122/7-B-1 H
Development, productionProducingOil
Drilled by Eni Norge AS with Scarabeo 8 in Goliat, 10.08.2015 to 28.08.2015 (18 days), to 3 730,0 m.
Water depth387,0 m
Total depth3 730,0 m MD
Vertical depth1 824,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud10.08.2015
Completed28.08.2015
OperatorEni Norge AS
Position71,2863 N, 22,2851 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Goliat gradient | 29,5 °C/km |
| Estimated at total depth from the gradient | 45 °C |
The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/7-B-4 Y1H | 0,0 | 2 746,0 | - | - | 2015 |
| 7122/7-B-4 Y2H | 0,0 | 2 744,0 | - | - | 2015 |
| 7122/7-B-2 H | 0,0 | 3 280,0 | - | - | 2015 |
| 7122/7-B-3 AH | 0,0 | 4 095,0 | - | - | 2025 |
| 7122/7-B-3 H | 0,0 | 3 400,0 | - | - | 2015 |
| 7122/7-U-6 | 0,1 | 635,5 | - | - | 2010 |
| 7122/7-H-2 H | 0,1 | 2 300,0 | - | - | 2017 |
| 7122/7-H-1 AH | 0,1 | 2 050,0 | - | - | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.