Fields / Goliat / 7122/7-C-2 Y2H
7122/7-C-2 Y2H
Development, productionClosedOil
Drilled by Vår Energi AS with Scarabeo 8 in Goliat, 28.01.2021 to 06.02.2021 (9 days), to 3 320,0 m.
Water depth373,5 m
Total depth3 320,0 m MD
Vertical depth1 176,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud28.01.2021
Completed06.02.2021
OperatorVår Energi AS
Position71,2776 N, 22,2786 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Goliat gradient | 29,5 °C/km |
| Estimated at total depth from the gradient | 27 °C |
The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/7-C-2 H same well | 0,0 | 3 280,0 | - | - | 2018 |
| 7122/7-C-3 Y1H | 0,0 | 2 930,0 | - | - | 2015 |
| 7122/7-C-3 Y2H | 0,0 | 2 805,0 | - | - | 2016 |
| 7122/7-C-1 AH | 0,0 | 2 561,0 | - | - | 2017 |
| 7122/7-C-1 AY2H | 0,0 | 2 325,0 | - | - | 2020 |
| 7122/7-C-1 H | 0,0 | 1 855,0 | - | - | 2017 |
| 7122/7-C-4 AH | 0,0 | 3 177,0 | - | - | 2026 |
| 7122/7-C-4 H | 0,0 | 3 436,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.