Fields / Goliat / 7122/7-D-4 H
7122/7-D-4 H
Development, productionPluggedOil
Drilled by Eni Norge AS with Scarabeo 8 in Goliat, 05.04.2014 to 07.05.2014 (32 days), to 2 600,0 m.
Water depth348,0 m
Total depth2 600,0 m MD
Vertical depth1 921,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud05.04.2014
Completed07.05.2014
OperatorEni Norge AS
Position71,2599 N, 22,2620 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Goliat gradient | 29,5 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/7-D-4 AH same well | 0,0 | 3 709,0 | - | - | 2014 |
| 7122/7-D-4 AY2H same well | 0,0 | 4 219,0 | - | - | 2022 |
| 7122/7-D-1 H | 0,0 | 4 221,0 | - | - | 2014 |
| 7122/7-D-1 Y2H | 0,0 | 3 444,0 | - | - | 2024 |
| 7122/7-D-3 H | 0,0 | 3 697,0 | - | - | 2014 |
| 7122/7-D-2 H | 0,0 | 4 093,0 | - | - | 2021 |
| 7122/7-U-5 | 0,1 | 553,1 | - | - | 2010 |
| 7122/7-F-3 H | 0,1 | 3 820,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.