WellplannerNorwegian shelf well data

Fields / Goliat / 7122/7-D-4 H

7122/7-D-4 H

Development, productionPluggedOil

Drilled by Eni Norge AS with Scarabeo 8 in Goliat, 05.04.2014 to 07.05.2014 (32 days), to 2 600,0 m.

Water depth348,0 m
Total depth2 600,0 m MD
Vertical depth1 921,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud05.04.2014
Completed07.05.2014
OperatorEni Norge AS
Position71,2599 N, 22,2620 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Goliat gradient29,5 °C/km
Estimated at total depth from the gradient49 °C

The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
7122/7-D-4 AH same well0,03 709,0--2014
7122/7-D-4 AY2H same well0,04 219,0--2022
7122/7-D-1 H0,04 221,0--2014
7122/7-D-1 Y2H0,03 444,0--2024
7122/7-D-3 H0,03 697,0--2014
7122/7-D-2 H0,04 093,0--2021
7122/7-U-50,1553,1--2010
7122/7-F-3 H0,13 820,0--2014

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗