WellplannerNorwegian shelf well data

Fields / Goliat / 7122/7-H-4 H

7122/7-H-4 H

Development, injectionClosedWater

Drilled by Eni Norge AS with Scarabeo 8 in Goliat, 26.01.2013 to 12.05.2013 (106 days), to 3 137,0 m.

Water depth383,0 m
Total depth3 137,0 m MD
Vertical depth2 222,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud26.01.2013
Completed12.05.2013
OperatorEni Norge AS
Position71,2865 N, 22,2883 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Goliat gradient29,5 °C/km
Estimated at total depth from the gradient57 °C

The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
7122/7-H-1 AH0,02 050,0--2013
7122/7-H-1 H0,02 280,0--2013
7122/7-H-3 H0,02 230,0--2013
7122/7-H-2 H0,02 300,0--2017
7122/7-U-60,0635,5--2010
7122/7-B-4 Y1H0,12 746,0--2015
7122/7-B-4 Y2H0,12 744,0--2015
7122/7-B-3 AH0,14 095,0--2025

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗