Fields / 7128/6-1
7128/6-1
Exploration, wildcatPlugged and abandonedOil shows
Drilled by Conoco Norway Inc. with Arcade Frontier, 11.08.1991 to 08.11.1991 (89 days), to 2 543,0 m in the Basement.
Water depth336,0 m
Total depth2 543,0 m MD
Vertical depth-
Bottom-hole temperature77 °C
Max inclination5,8°
Rotary table23,5 m
Formation at total depthBasement
RigArcade Frontier
Spud11.08.1991
Completed08.11.1991
OperatorConoco Norway Inc.
Position71,5181 N, 28,8176 E
Formations
17 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 77 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
No other wellbore lies within 15 km, or the position is not reported.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 453,0 | 36" | 455,0 | - |
| Intermediate | 20" | 823,8 | 26" | 825,0 | - |
| Intermediate | 13 3/8" | 1 569,4 | 17 1/2" | 1 570,0 | - |
| Intermediate | 9 5/8" | 1 800,0 | 12 1/4" | 1 802,0 | - |
| Open hole | - | 2 543,0 | 8 1/2" | 2 543,0 | - |
Mud weight
79 measurements, one dot each, 1,00 to 1,44 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 1 622,5 - 1 664,0 | - | 16,0 | - | - | - |