Fields / 7132/2-2
7132/2-2
Exploration, wildcatPlugged and abandonedDry
Drilled by Equinor Energy AS with West Hercules, 06.01.2019 to 07.04.2019 (91 days), to 3 528,0 m in the Røye Formation.
Water depth304,0 m
Total depth3 528,0 m MD
Vertical depth3 527,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depthRøye Formation
RigWest Hercules
Spud06.01.2019
Completed07.04.2019
OperatorEquinor Energy AS
Position71,8412 N, 32,3883 E
Formations
19 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7132/2-1 | 3,1 | 883,0 | - | 1,35 | 2019 |
| 7132/2-U-1 | 3,1 | 601,0 | - | - | 2018 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 385,9 | 41" | 388,2 | - |
| Surface casing | 20" | 594,6 | 26" | 601,0 | 1,39 FIT |
| Intermediate | 13 3/8" | 952,6 | 17 1/2" | 962,0 | 1,50 FIT |
| Liner | 9 5/8" | 1 849,0 | 12 1/4" | 1 851,0 | 1,83 LOT |
| Liner | 7" | 3 144,3 | 8 1/2" | 3 400,0 | 1,61 FIT |
| Open hole | - | 3 528,0 | 6" | 3 528,0 | - |
Mud weight
23 measurements, one dot each, 1,00 to 1,37 g/cm³ against measured depth, innovert, kcl/polymer/gem, seawater.