Fields / 7218/8-1
7218/8-1
Exploration, wildcatPlugged and abandonedDry
Drilled by GDF SUEZ E&P Norge AS with Transocean Barents, 03.03.2014 to 10.04.2014 (38 days), to 3 000,0 m in the Kolmule Formation.
Water depth385,0 m
Total depth3 000,0 m MD
Vertical depth3 000,0 m TVD
Bottom-hole temperature-
Max inclination2,0°
Rotary table40,0 m
Formation at total depthKolmule Formation
RigTransocean Barents
Spud03.03.2014
Completed10.04.2014
OperatorGDF SUEZ E&P Norge AS
Position72,3335 N, 18,4774 E
Formations
8 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7218/8-U-1 | 0,0 | 949,0 | - | - | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 484,0 | 36" | 488,0 | - |
| Surface casing | 20" | 937,0 | 26" | 941,0 | - |
| Pilot hole | - | 949,0 | 9 7/8" | 949,0 | - |
| Intermediate | 9 5/8" | 1 733,0 | 12 1/4" | 1 740,0 | - |
| Open hole | - | 3 000,0 | 8 1/2" | 3 000,0 | - |
Mud weight
5 measurements, one dot each, 1,20 to 1,33 g/cm³ against measured depth, ems 3100, glydril, glydril.