Fields / 7220/2-2
7220/2-2
Exploration, wildcatPlugged and abandonedShows
Drilled by Equinor Energy AS with Transocean Enabler, 04.06.2024 to 18.06.2024 (14 days), to 853,0 m in the Nordmela Formation.
Water depth427,0 m
Total depth853,0 m MD
Vertical depth853,0 m TVD
Bottom-hole temperature36 °C
Max inclination0,4°
Rotary table32,0 m
Formation at total depthNordmela Formation
RigTransocean Enabler
Spud04.06.2024
Completed18.06.2024
OperatorEquinor Energy AS
Position72,7720 N, 20,5765 E
Formations
8 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 36 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7220/2-U-1 | 2,3 | 444,0 | - | - | 1985 |
| 7220/2-1 | 4,5 | 1 594,0 | - | 1,20 | 2014 |
| 7220/2-U-2 | 4,5 | 680,0 | - | - | 2014 |
| 7220/5-4 | 9,7 | 2 170,0 | - | - | 2025 |
| 7220/6-3 | 10,2 | 1 300,0 | - | 1,50 | 2017 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Surface casing | 20" | 478,0 | 36" | 481,0 | - |
| Intermediate | 9 5/8" | 685,1 | 12 1/4" | 693,0 | 1,35 FIT |
Mud weight
6 measurements, one dot each, 1,10 to 1,60 g/cm³ against measured depth, kcl/gem/polymer.